← All answers

Storerooms and spare parts

How should a plant assess obsolescence risk for critical equipment?

Obsolescence risk is the combination of a part becoming unavailable and the consequences of not restoring its function. An inventory count alone does not show whether a critical plant can recover from failure.

Identify exposed components

Start with critical assets and their replaceable controls, drives, protection relays, circuit boards, instrumentation and proprietary mechanical components. Record manufacturer, model, firmware, installed quantity, approved alternatives and the asset functions each part supports.

Verify lifecycle status

Seek written manufacturer lifecycle notices, service availability, repair capability, lead times and last time buy deadlines. A reseller listing is not proof of an approved replacement. Check software licensing, communication protocols and cybersecurity support for electronic components.

Rank business exposure

Combine consequence of functional loss, installed population, common cause exposure, spare condition, lead time and tested replacement options. A discontinued component with a proven stocked replacement may be lower risk than an actively sold component with a one year lead time and no bypass strategy.

Choose the mitigation

Options include tested strategic spares, qualified repair vendors, approved interchangeability, retrofit kits, phased migration and full system replacement. Validate fit, function, safety approvals, configuration and supportability before accepting a substitute. Use change control for protection or control system modifications.

Test and revisit

Inspect stored spares, preserve them to OEM requirements and conduct periodic bench tests where appropriate. Review obsolescence at annual asset strategy meetings and before major outages. Measure unresolved high risk items and estimated restoration time, not just purchase value.

Implementation checklist

Apply site specific engineering judgment and applicable regulations. This guidance does not replace OEM instructions, safety procedures or authorized technical approval.

Explore KANE consulting

Discuss practical maintenance and reliability improvements for your facility.

Request a consultation →

Related answers: Related guidance · Additional guidance

Technical reference

NIST SP 800-82 Rev. 3 OT security