← All answers

Root cause analysis

How should a plant investigate a suspected heat exchanger tube leak?

Protect personnel and process boundaries first, then use operating evidence and an engineered inspection plan to distinguish tube leakage from other contamination paths.

Recognize and stabilize the event

Review pressure differentials, chemistry changes, unexpected inventory losses, conductivity, cross-contamination and leak alarms. Follow operating procedures for isolation and depressurization. Consider hazardous mixing and overpressure risks.

Build an evidence timeline

Capture process trends, maintenance history, water treatment records, corrosion monitoring, thermal cycling and recent cleaning or repair work. Confirm sampling integrity before attributing chemistry changes to a tube leak.

Select inspection methods

Engineering and qualified inspectors should choose appropriate pressure tests, eddy current, ultrasonic, dye penetrant or other NDE methods for the exchanger design and materials. Follow applicable code, manufacturer and plant procedures; avoid uncontrolled pressure testing.

Resolve failure mechanism and recurrence

Differentiate corrosion, erosion, vibration, fatigue, thermal stress and manufacturing defects. Record the failed location, metallurgical evidence, repair method, inspection acceptance criteria and future monitoring strategy.

Industrial example

A cooling-water exchanger shows rising chloride in the process circuit. Isolation testing and tube inspection locate a leak near a support plate. The investigation identifies localized vibration damage and leads to support inspection rather than a tube plug alone.

Implementation checklist

Explore KANE consulting

Discuss practical maintenance and reliability improvements for your facility.

Request a consultation →

Related answers: Related guidance · Additional guidance

Technical references

ASME Boiler and Pressure Vessel Code · API standards