← All answers

Industrial AI readiness

How should a plant handle missing historian data during a maintenance investigation?

Missing process data is evidence of an information gap, not proof that an event did not occur. Investigators should preserve the gap, establish its cause and avoid letting analytics silently fill it with invented certainty.

Define the gap precisely

Record the affected tags, timestamps, historian collection method, expected sampling frequency, compression settings and data quality flags. Check whether the loss affects one sensor, one gateway, a whole collector or the historian archive.

Reconstruct from independent evidence

Compare DCS alarms, sequence of events, controller logs, operator logbooks, CMMS records and redundant instruments. Normalize timestamps and time zones before drawing conclusions. Distinguish raw source readings from interpolated or inferred values.

Assess the decision impact

A short gap in a stable temperature trend may not alter a maintenance decision. A missing interval covering a trip, startup or protective actuation can make root cause attribution uncertain. State what remains unknown and which conclusions cannot be supported.

Control analytical handling

Flag missing, stale, substituted and manually corrected values in data pipelines. For AI applications, carry quality flags and source lineage into the output, suppress high confidence recommendations where key evidence is missing and require human review for consequential actions.

Prevent recurrence

Investigate network interruptions, time synchronization, buffering limits, tag configuration, collector health and retention policy. Test store and forward recovery where supported. Track data completeness by critical tag and operating mode rather than only an aggregate uptime percentage.

Implementation checklist

Apply site specific engineering judgment and applicable regulations. This guidance does not replace OEM instructions, safety procedures or authorized technical approval.

Explore KANE consulting

Discuss practical maintenance and reliability improvements for your facility.

Request a consultation →

Related answers: Related guidance · Additional guidance

Technical reference

NIST SP 800-82 Rev. 3 OT security